PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued welding and repairing the main steel column at the Monumental Stairs Facing West (800x600).jpg Installed rebar inside the couplers around the 4th floor Facing North-West (800x600).jpg Metal decking at Derrick 4 (Roof) Facing South (800x600).jpg Started installing metal decking at only half of Derricks 4 - 5 Facing West (800x600).jpg Stripped the slab on deck forms at the 3rd floor Facing South-West (800x600).jpg Installing duct hangers at the 1st Floor Facing West (800x600).jpg
Previous pageNext page Installed rebar inside the couplers around the 4th floor Facing North-West (800x600)
Installed rebar inside the couplers around the 4th floor Facing North-West (800x600)